our projects
The team at Curtis Furniture have supported us with 1,000+ key refurbishment projects over the past three years. The projects have been delivered at speed, with concurrent phases across a national portfolio of hotels, and the quality of case goods and loose furniture has remained consistently high. We trust Curtis to align with our standards of excellence, particularly in respect of quality and sustainability. We also know that, if and when projects throw up issues, we can rely on the team to respond swiftly and proactively."
We have worked with the team at Curtis Furniture on multiple hotel projects and for over 10 years. The Marriott Kensington was, like many of our previous hotel projects, both large and complex. We know from experience that Curtis make an excellent product, however it is their communication and flexibility that sets them apart.
They provide a dedicated project manager and installation manager to each job, providing a quick responsive team who work with us throughout both the manufacture and installation of the furniture. We would not hesitate in recommending Curtis."
County worked with Curtis on the recent renovation of 301 bedrooms at the Delta by Marriott in Bristol city centre. The renovation took place over 10 phases whilst the hotel was in operation. From start to finish this refurbishment project was managed by our project management team and the Curtis dedicated project management team who went above and beyond to ensure the project ran smoothly and to schedule. We have worked with Curtis on many projects and will continue to do so in future."
In developing our design and aesthetic for our first Residents Club in South Kensington, it was essential to find exactly the right furniture partner. We wanted a company that would be completely in tune with our ambitions and yet contribute their own specialist knowledge - and in line with our commitment to sustainability, it was a key priority they should be a UK based manufacturer. The partnership we formed with Curtis delivered on all these key requirements and we look forward to working with Curtis again."
We worked with Curtis on the refurbishment of Hilton Glasgow. The 1st phase provided the challenge of three different room designs and the immovable target of the COP 26 UN Conference. Given the speed and quality of Phase 1, we had no hesitation in inviting them back to do the Phase 2 bedrooms a year later."
County Contractors appointed Curtis to deliver the case good package for their fast track 311 bedroom refurbishment at the Crowne Plaza, Birmingham. As with all live refurbishments, a flexible, professional, prompt approach to delivery and problem solving was required by all and Curtis once again met all of these challenges with an excellent service. We would have no hesitation to recommend Curtis on future projects.
"We partnered with Curtis for the refurbishment of 34 executive rooms and suites as part of the first phase of our upgrade at Vale Resort, and the experience was good from start to finish.
Working directly with their team, we found Curtis to be professional, responsive and highly collaborative throughout the process. The furniture was manufactured and installed to a high standard, with great attention to detail. The finished rooms have elevated the look and feel of our executive offering, delivering the quality and comfort our guests expect. We would be happy to recommend the team at Curtis.”
"We recently completed a significant extension at the Village Hotel, Manchester Ashton, adding a further 48 guestrooms to their existing operation. Curtis played a key role in this transformation by supplying the furniture for the new bedrooms. From the initial consultation to the final installation, the team at Curtis demonstrated exceptional professionalism and attention to detail. Their expertise ensured that each piece complemented our design vision, enhancing the overall guest experience. Curtis's commitment to excellence and their ability to meet our tight deadlines made the entire process seamless and stress-free. We are incredibly pleased with the results and would highly recommend Curtis Furniture."
The hotel's floor footprint resulted in various room types and configurations to accommodate the available space. To ensure the correct setup and components for each room, a master matrix was developed for Curtis to refer to. Each phase had a one-month timeframe, which Curtis had to manage efficiently to meet handover deadlines. Occasionally, the team had to work at a fast pace to accommodate additional joinery requested by the client. But the installation process was consistent throughout each phase to meet handover.