our projects
We worked with Curtis on the refurbishment of Hilton Glasgow. The 1st phase provided the challenge of three different room designs and the immovable target of the COP 26 UN Conference. Given the speed and quality of Phase 1, we had no hesitation in inviting them back to do the Phase 2 bedrooms a year later."
Curtis helped us to achieve the stunning aesthetic of Malmaison Manchester Deansgate. Working to drawings and moodboards from Koncept design, they made the furniture and fittings as we had envisioned. The details and quality absolutely align with the craftsmanship that we’d expect from Curtis and the style credentials of Malmaison."
Curtis manufactured 312 rooms of high quality, bespoke bedroom furniture for The Tribe hotel. Communication was speedy and consistent, and the furniture received was of high quality and offered excellent value for money. Due to the scale of the project there were changes and issues which Curtis helped us to overcome. I look forward to working with Curtis on further projects in the future.
I have worked with Curtis many times. The projects have spanned small refurbishments, to the full refit of the 312 room Belfry Hotel. They are always supportive and passionate about the projects from the initial conversations, right through to their on-site installation."
AKP Scotland have been working with Curtis Furniture for the last 10 months on the refurbishment of the Marriott Glasgow Hotel. We have now completed over 200 rooms of this 300 room hotel. As with any large refurbishment in a trading hotel there have been many difficult challenges. I am pleased to say that the Curtis team have not only manufactured and installed high quality furniture, they have also shown us flexibility and on-site support. In particular, we found the attitude of the sales and delivery team to be exceptionally positive. We look forward to working with Curtis again on our future hotel projects”
We have worked with Curtis on many hotels and I am pleased to say that, yet again, they performed well on our latest project for Ember Locke in Kensington. They manufactured 120 kitchens for our project and were a great support in engineering and designing kitchens which worked across the many challenging room types in this beautiful period building. The deliveries were communicated by a dedicated project manager and the furniture arrived on time for what was a challenging multi phased programme."
Sharkey UK worked with Curtis on The Schloss Roxburghe to create the modern, elegant bedrooms in the new Estate House. Curtis manufactured and installed the luxurious fittings and fixtures to an excellent standard. The project was expertly managed from start to finish from design work to manufacture, with quick and easy communication which helped the project run smoothly. We have worked with Curtis on many projects and will continue to do so in the future."
The hotel's floor footprint resulted in various room types and configurations to accommodate the available space. To ensure the correct setup and components for each room, a master matrix was developed for Curtis to refer to. Each phase had a one-month timeframe, which Curtis had to manage efficiently to meet handover deadlines. Occasionally, the team had to work at a fast pace to accommodate additional joinery requested by the client. But the installation process was consistent throughout each phase to meet handover.