In developing our design and aesthetic for our first Residents Club in South Kensington, it was essential to find exactly the right furniture partner. We wanted a company that would be completely in tune with our ambitions and yet contribute their own specialist knowledge - and in line with our commitment to sustainability, it was a key priority they should be a UK based manufacturer. The partnership we formed with Curtis delivered on all these key requirements and we look forward to working with Curtis again."
We worked with Curtis on the refurbishment of Hilton Glasgow. The 1st phase provided the challenge of three different room designs and the immovable target of the COP 26 UN Conference. Given the speed and quality of Phase 1, we had no hesitation in inviting them back to do the Phase 2 bedrooms a year later."
The hotel's floor footprint resulted in various room types and configurations to accommodate the available space. To ensure the correct setup and components for each room, a master matrix was developed for Curtis to refer to. Each phase had a one-month timeframe, which Curtis had to manage efficiently to meet handover deadlines. Occasionally, the team had to work at a fast pace to accommodate additional joinery requested by the client. But the installation process was consistent throughout each phase to meet handover.
Sharkey UK worked with Curtis on The Schloss Roxburghe to create the modern, elegant bedrooms in the new Estate House. Curtis manufactured and installed the luxurious fittings and fixtures to an excellent standard. The project was expertly managed from start to finish from design work to manufacture, with quick and easy communication which helped the project run smoothly. We have worked with Curtis on many projects and will continue to do so in the future."
The team at Curtis were integral to the magnificent refurbishment of The Queens Hotel in Leeds. All the bedrooms were transformed plus 17 new added, bringing the room total to 232 including a Presidential Suite. Curtis’s designers helped to achieve the art-deco inspired interiors. Choosing Curtis offered huge advantages from the initial consultations and site visits, right though to delivery and installation."
Curtis have successfully manufactured and installed quality fixed furniture on a number of our hotels. We have found the team to be very customer focused and they have always delivered in a collaborative manner."
We have worked with Curtis on many hotels and I am pleased to say that, yet again, they performed well on our latest project for Ember Locke in Kensington. They manufactured 120 kitchens for our project and were a great support in engineering and designing kitchens which worked across the many challenging room types in this beautiful period building. The deliveries were communicated by a dedicated project manager and the furniture arrived on time for what was a challenging multi phased programme."
Curtis recently worked with ourselves on a fast paced 274 bedroom refurbishment in the iconic Hilton Park Lane, London. From initial design stage Curtis provided an efficient service, producing drawings in a timely fashion, and nothing was an issue for them…even though this process ate into the Christmas holiday season!
From the delivery of materials, control of quality and the install process, Curtis once again provided an excellent service, leaving minimal defects or issues. They also proved extremely flexible with their approach, thus allowing us to complete the project 2 weeks in advance of the contracted handover which is a great achievement for all involved.
We would have no hesitation in using Curtis again for future projects."