our projects
The hotel's floor footprint resulted in various room types and configurations to accommodate the available space. To ensure the correct setup and components for each room, a master matrix was developed for Curtis to refer to. Each phase had a one-month timeframe, which Curtis had to manage efficiently to meet handover deadlines. Occasionally, the team had to work at a fast pace to accommodate additional joinery requested by the client. But the installation process was consistent throughout each phase to meet handover.
Curtis manufactured bespoke furniture for 60 bedrooms at the prestigious St Andrews’ Old Course Hotel, Golf Resort & Spa. The hotel remained open throughout its multi-million pound refurbishment which meant that Curtis had to ensure the manufacture process ran smoothly and on time. Curtis’s experience in delivering hotel refurbishment projects enabled us to complete the project on time ahead of the Open."
Curtis recently worked with ourselves on a fast paced 274 bedroom refurbishment in the iconic Hilton Park Lane, London. From initial design stage Curtis provided an efficient service, producing drawings in a timely fashion, and nothing was an issue for them…even though this process ate into the Christmas holiday season!
From the delivery of materials, control of quality and the install process, Curtis once again provided an excellent service, leaving minimal defects or issues. They also proved extremely flexible with their approach, thus allowing us to complete the project 2 weeks in advance of the contracted handover which is a great achievement for all involved.
We would have no hesitation in using Curtis again for future projects."
Curtis helped us to achieve the stunning aesthetic of Malmaison Manchester Deansgate. Working to drawings and moodboards from Koncept design, they made the furniture and fittings as we had envisioned. The details and quality absolutely align with the craftsmanship that we’d expect from Curtis and the style credentials of Malmaison."
We recently completed a significant renovation at the Hilton Leeds City, focusing on upgrading our guestrooms. Curtis played a pivotal role in this transformation by supplying high-quality case goods in collaboration with Bell & Swift.
From the initial consultation to the final installation, the team at Curtis demonstrated exceptional professionalism and attention to detail. Their expertise ensured that each piece perfectly complemented our design vision, enhancing the overall guest experience.
Curtis's commitment to excellence and their ability to meet our tight deadlines made the entire process seamless and stress-free. We are incredibly pleased with the results and would highly recommend Curtis Furniture.
County Contractors appointed Curtis to deliver the case good package for their fast track 311 bedroom refurbishment at the Crowne Plaza, Birmingham. As with all live refurbishments, a flexible, professional, prompt approach to delivery and problem solving was required by all and Curtis once again met all of these challenges with an excellent service. We would have no hesitation to recommend Curtis on future projects.
The Hilton Hotel Cobham is one of many projects for which we have employed Curtis Furniture for more than a decade. The Curtis team and factory have always been flexible and quick to react. From start to finish their project manager communicated very well and the finished product is, as ever, excellent."
Curtis completed the design, supply and installation of the bedroom FF&E at the new Hilton Garden Inn hotel extension at our Lancashire County Cricket Club project. From pre-construction through to installation, the team have been a pleasure to deal with. They were helpful and their knowledge of the Hilton Brand Standard products has been invaluable to the project."