our projects
Sharkey UK worked with Curtis on The Schloss Roxburghe to create the modern, elegant bedrooms in the new Estate House. Curtis manufactured and installed the luxurious fittings and fixtures to an excellent standard. The project was expertly managed from start to finish from design work to manufacture, with quick and easy communication which helped the project run smoothly. We have worked with Curtis on many projects and will continue to do so in the future."
County worked with Curtis on the recent renovation of 301 bedrooms at the Delta by Marriott in Bristol city centre. The renovation took place over 10 phases whilst the hotel was in operation. From start to finish this refurbishment project was managed by our project management team and the Curtis dedicated project management team who went above and beyond to ensure the project ran smoothly and to schedule. We have worked with Curtis on many projects and will continue to do so in future."
The Hilton Hotel Cobham is one of many projects for which we have employed Curtis Furniture for more than a decade. The Curtis team and factory have always been flexible and quick to react. From start to finish their project manager communicated very well and the finished product is, as ever, excellent."
I have worked with Curtis many times. The projects have spanned small refurbishments, to the full refit of the 312 room Belfry Hotel. They are always supportive and passionate about the projects from the initial conversations, right through to their on-site installation."
Curtis helped us to achieve the stunning aesthetic of Malmaison Manchester Deansgate. Working to drawings and moodboards from Koncept design, they made the furniture and fittings as we had envisioned. The details and quality absolutely align with the craftsmanship that we’d expect from Curtis and the style credentials of Malmaison."
Curtis completed the design, supply and installation of the bedroom FF&E at the new Hilton Garden Inn hotel extension at our Lancashire County Cricket Club project. From pre-construction through to installation, the team have been a pleasure to deal with. They were helpful and their knowledge of the Hilton Brand Standard products has been invaluable to the project."
County Contractors appointed Curtis to deliver the case good package for their fast track 311 bedroom refurbishment at the Crowne Plaza, Birmingham. As with all live refurbishments, a flexible, professional, prompt approach to delivery and problem solving was required by all and Curtis once again met all of these challenges with an excellent service. We would have no hesitation to recommend Curtis on future projects.
"We recently completed a significant extension at the Village Hotel, Manchester Ashton, adding a further 48 guestrooms to their existing operation. Curtis played a key role in this transformation by supplying the furniture for the new bedrooms. From the initial consultation to the final installation, the team at Curtis demonstrated exceptional professionalism and attention to detail. Their expertise ensured that each piece complemented our design vision, enhancing the overall guest experience. Curtis's commitment to excellence and their ability to meet our tight deadlines made the entire process seamless and stress-free. We are incredibly pleased with the results and would highly recommend Curtis Furniture."
“Much of a Hotel Indigo’s retelling of their individual neighbourhood story is achieved through design, weaving in local themes and references, thus demanding bespoke, considered solutions rather than standard off-the-peg options. Curtis’ genuine interest in the successful execution of the brief, giving nods to the local goldsmiths, architects and horologists, was both reassuringly productive and also refreshing. The initial expectations from us, the client, did not encompass the flexibility, time and grace that the Curtis team utilised, allowing the successful navigation around the preliminary value engineering and design adaptation demands, nor did we predict the continuation of this additional layer of client support which transpired to be pivotal to dissolving several unexpected hurdles which emerged as the build progressed.”