We have worked with the team at Curtis for over 20 years and on various hotel brands and private owners. They respond promptly when design information is issued and provide detailed quotations. They are also proactive when helping to resolve budgets or programme issues which arise. Their UK factory enables them to provide high quality furniture and to be flexible in meeting the challenges of large and complex installations."
Having partnered with Curtis Furniture on previous projects in the UK, we were pleased to appoint them as the bedroom furnishings supplier for Seaton House and Dunluce Lodge. Their meticulous attention to detail throughout the planning and manufacturing processes was greatly appreciated. They executed the design vision of each property flawlessly, while ensuring each remained distinctive.
County worked with Curtis on the recent renovation of 301 bedrooms at the Delta by Marriott in Bristol city centre. The renovation took place over 10 phases whilst the hotel was in operation. From start to finish this refurbishment project was managed by our project management team and the Curtis dedicated project management team who went above and beyond to ensure the project ran smoothly and to schedule. We have worked with Curtis on many projects and will continue to do so in future."
We have worked with Curtis on many hotels and I am pleased to say that, yet again, they performed well on our latest project for Ember Locke in Kensington. They manufactured 120 kitchens for our project and were a great support in engineering and designing kitchens which worked across the many challenging room types in this beautiful period building. The deliveries were communicated by a dedicated project manager and the furniture arrived on time for what was a challenging multi phased programme."
To avoid the risks of shipping from outside the UK, we wanted to select a British Manufacturer, and Curtis are one of the few with the capacity to supply bespoke case goods for 1,000 rooms over a 12-month project. Our relationship with Curtis goes back over 20 years. We needed to choose an expert partner we could trust to turn around the room refurbishments in a timely manner and with minimal disruption, as the hotel remained fully operational throughout."
AKP Scotland have been working with Curtis Furniture for the last 10 months on the refurbishment of the Marriott Glasgow Hotel. We have now completed over 200 rooms of this 300 room hotel. As with any large refurbishment in a trading hotel there have been many difficult challenges. I am pleased to say that the Curtis team have not only manufactured and installed high quality furniture, they have also shown us flexibility and on-site support. In particular, we found the attitude of the sales and delivery team to be exceptionally positive. We look forward to working with Curtis again on our future hotel projects”
Curtis completed the design, supply and installation of the bedroom FF&E at the new Hilton Garden Inn hotel extension at our Lancashire County Cricket Club project. From pre-construction through to installation, the team have been a pleasure to deal with. They were helpful and their knowledge of the Hilton Brand Standard products has been invaluable to the project."
Curtis recently worked with ourselves on a fast paced 274 bedroom refurbishment in the iconic Hilton Park Lane, London. From initial design stage Curtis provided an efficient service, producing drawings in a timely fashion, and nothing was an issue for them…even though this process ate into the Christmas holiday season!
From the delivery of materials, control of quality and the install process, Curtis once again provided an excellent service, leaving minimal defects or issues. They also proved extremely flexible with their approach, thus allowing us to complete the project 2 weeks in advance of the contracted handover which is a great achievement for all involved.
We would have no hesitation in using Curtis again for future projects."