We have worked with the team at Curtis Furniture on multiple hotel projects and for over 10 years. The Marriott Kensington was, like many of our previous hotel projects, both large and complex. We know from experience that Curtis make an excellent product, however it is their communication and flexibility that sets them apart.
They provide a dedicated project manager and installation manager to each job, providing a quick responsive team who work with us throughout both the manufacture and installation of the furniture. We would not hesitate in recommending Curtis."
I have worked with Curtis many times. The projects have spanned small refurbishments, to the full refit of the 312 room Belfry Hotel. They are always supportive and passionate about the projects from the initial conversations, right through to their on-site installation."
We worked with Curtis on the refurbishment of Hilton Glasgow. The 1st phase provided the challenge of three different room designs and the immovable target of the COP 26 UN Conference. Given the speed and quality of Phase 1, we had no hesitation in inviting them back to do the Phase 2 bedrooms a year later."
We have worked with Curtis on many hotels and I am pleased to say that, yet again, they performed well on our latest project for Ember Locke in Kensington. They manufactured 120 kitchens for our project and were a great support in engineering and designing kitchens which worked across the many challenging room types in this beautiful period building. The deliveries were communicated by a dedicated project manager and the furniture arrived on time for what was a challenging multi phased programme."
Curtis recently worked with ourselves on a fast paced 274 bedroom refurbishment in the iconic Hilton Park Lane, London. From initial design stage Curtis provided an efficient service, producing drawings in a timely fashion, and nothing was an issue for them…even though this process ate into the Christmas holiday season!
From the delivery of materials, control of quality and the install process, Curtis once again provided an excellent service, leaving minimal defects or issues. They also proved extremely flexible with their approach, thus allowing us to complete the project 2 weeks in advance of the contracted handover which is a great achievement for all involved.
We would have no hesitation in using Curtis again for future projects."
Barton Minty have engaged Curtis Furniture on several hotel projects, across a wide variety of brands and locations. As with most large scale hotel refurbishment, all have had their own specific challenges. The team at Curtis were always able to find solutions, resulting in delivery and installation of long lasting furniture."
The Hilton Hotel Cobham is one of many projects for which we have employed Curtis Furniture for more than a decade. The Curtis team and factory have always been flexible and quick to react. From start to finish their project manager communicated very well and the finished product is, as ever, excellent."
Curtis have successfully manufactured and installed quality fixed furniture on a number of our hotels. We have found the team to be very customer focused and they have always delivered in a collaborative manner."