our projects
The hotel's floor footprint resulted in various room types and configurations to accommodate the available space. To ensure the correct setup and components for each room, a master matrix was developed for Curtis to refer to. Each phase had a one-month timeframe, which Curtis had to manage efficiently to meet handover deadlines. Occasionally, the team had to work at a fast pace to accommodate additional joinery requested by the client. But the installation process was consistent throughout each phase to meet handover.
The team at Curtis were integral to the magnificent refurbishment of The Queens Hotel in Leeds. All the bedrooms were transformed plus 17 new added, bringing the room total to 232 including a Presidential Suite. Curtis’s designers helped to achieve the art-deco inspired interiors. Choosing Curtis offered huge advantages from the initial consultations and site visits, right though to delivery and installation."
County Contractors appointed Curtis to deliver the case good package for their fast track 311 bedroom refurbishment at the Crowne Plaza, Birmingham. As with all live refurbishments, a flexible, professional, prompt approach to delivery and problem solving was required by all and Curtis once again met all of these challenges with an excellent service. We would have no hesitation to recommend Curtis on future projects.
We recently completed a significant renovation at the Hilton Leeds City, focusing on upgrading our guestrooms. Curtis played a pivotal role in this transformation by supplying high-quality case goods in collaboration with Bell & Swift.
From the initial consultation to the final installation, the team at Curtis demonstrated exceptional professionalism and attention to detail. Their expertise ensured that each piece perfectly complemented our design vision, enhancing the overall guest experience.
Curtis's commitment to excellence and their ability to meet our tight deadlines made the entire process seamless and stress-free. We are incredibly pleased with the results and would highly recommend Curtis Furniture.
We worked with Curtis on the refurbishment of Hilton Glasgow. The 1st phase provided the challenge of three different room designs and the immovable target of the COP 26 UN Conference. Given the speed and quality of Phase 1, we had no hesitation in inviting them back to do the Phase 2 bedrooms a year later."
In developing our design and aesthetic for our first Residents Club in South Kensington, it was essential to find exactly the right furniture partner. We wanted a company that would be completely in tune with our ambitions and yet contribute their own specialist knowledge - and in line with our commitment to sustainability, it was a key priority they should be a UK based manufacturer. The partnership we formed with Curtis delivered on all these key requirements and we look forward to working with Curtis again."
Curtis completed the design, supply and installation of the bedroom FF&E at the new Hilton Garden Inn hotel extension at our Lancashire County Cricket Club project. From pre-construction through to installation, the team have been a pleasure to deal with. They were helpful and their knowledge of the Hilton Brand Standard products has been invaluable to the project."
The Hilton Hotel Cobham is one of many projects for which we have employed Curtis Furniture for more than a decade. The Curtis team and factory have always been flexible and quick to react. From start to finish their project manager communicated very well and the finished product is, as ever, excellent."