our projects
"We partnered with Curtis for the refurbishment of 34 executive rooms and suites as part of the first phase of our upgrade at Vale Resort, and the experience was good from start to finish.
Working directly with their team, we found Curtis to be professional, responsive and highly collaborative throughout the process. The furniture was manufactured and installed to a high standard, with great attention to detail. The finished rooms have elevated the look and feel of our executive offering, delivering the quality and comfort our guests expect. We would be happy to recommend the team at Curtis.”
The team at Curtis Furniture have supported us with 1,000+ key refurbishment projects over the past three years. The projects have been delivered at speed, with concurrent phases across a national portfolio of hotels, and the quality of case goods and loose furniture has remained consistently high. We trust Curtis to align with our standards of excellence, particularly in respect of quality and sustainability. We also know that, if and when projects throw up issues, we can rely on the team to respond swiftly and proactively."
Barton Minty have engaged Curtis Furniture on several hotel projects, across a wide variety of brands and locations. As with most large scale hotel refurbishment, all have had their own specific challenges. The team at Curtis were always able to find solutions, resulting in delivery and installation of long lasting furniture."
The Hilton Hotel Cobham is one of many projects for which we have employed Curtis Furniture for more than a decade. The Curtis team and factory have always been flexible and quick to react. From start to finish their project manager communicated very well and the finished product is, as ever, excellent."
AKP Scotland have been working with Curtis Furniture for the last 10 months on the refurbishment of the Marriott Glasgow Hotel. We have now completed over 200 rooms of this 300 room hotel. As with any large refurbishment in a trading hotel there have been many difficult challenges. I am pleased to say that the Curtis team have not only manufactured and installed high quality furniture, they have also shown us flexibility and on-site support. In particular, we found the attitude of the sales and delivery team to be exceptionally positive. We look forward to working with Curtis again on our future hotel projects”
We have worked with the team at Curtis for over 20 years and on various hotel brands and private owners. They respond promptly when design information is issued and provide detailed quotations. They are also proactive when helping to resolve budgets or programme issues which arise. Their UK factory enables them to provide high quality furniture and to be flexible in meeting the challenges of large and complex installations."
“Much of a Hotel Indigo’s retelling of their individual neighbourhood story is achieved through design, weaving in local themes and references, thus demanding bespoke, considered solutions rather than standard off-the-peg options. Curtis’ genuine interest in the successful execution of the brief, giving nods to the local goldsmiths, architects and horologists, was both reassuringly productive and also refreshing. The initial expectations from us, the client, did not encompass the flexibility, time and grace that the Curtis team utilised, allowing the successful navigation around the preliminary value engineering and design adaptation demands, nor did we predict the continuation of this additional layer of client support which transpired to be pivotal to dissolving several unexpected hurdles which emerged as the build progressed.”
We have worked with Curtis on many hotels and I am pleased to say that, yet again, they performed well on our latest project for Ember Locke in Kensington. They manufactured 120 kitchens for our project and were a great support in engineering and designing kitchens which worked across the many challenging room types in this beautiful period building. The deliveries were communicated by a dedicated project manager and the furniture arrived on time for what was a challenging multi phased programme."
We worked with Curtis on the refurbishment of Hilton Glasgow. The 1st phase provided the challenge of three different room designs and the immovable target of the COP 26 UN Conference. Given the speed and quality of Phase 1, we had no hesitation in inviting them back to do the Phase 2 bedrooms a year later."